75% subsidy announced for charging points


(mender) #1

(osbrook) #2

These charge points are certainly not required for Twizy with an expected install cost of between £1000 and £1500, they must be good.
Owners expected to pay a min of £250 to £750 of that.

By the time I need one of these points the subsidy will be long gone.


(system) #3

IMO most people will pay £330 because that will allow the installer to claim the maximum grant £1000 (75%).

The grant is available until April 2015 so if you invest in a qualifying EV before then you can have a shiny new Charging Station :smiley: